Muskingum River Ash Basin

Muskingum River Ash Basin2018-01-17T20:39:45+00:00

Project Description

Muskingum River Ash Basin Closure Design and Permitting, Waterford, OH.   Developed geotechnical investigation, slope stability assessment and static and seismic stability evaluation for a 38-acre coal ash impoundment closure project.   Project activities included review of post-construction stormwater and groundwater flow requirements, and evaluation of the final cover system stability. Together we developed a practical and thorough approach for evaluating ash basin closure plans that followed guidelines provided by the power company engineers and the Ohio EPA regulators.    Additionally, we implemented innovative porewater pressure monitoring and vane shear testing methods that are being used by engineers and contractors across the United States.

Upcoming Events

There are no upcoming events at this time.

Contact Info

9319 Robert D Snyder Road
Suite 340, PORTAL Building at UNC Charlotte
Charlotte, NC 28262

Phone: 704.687.0948

Recent Posts